July 13,2014 – Sir John Carling Building Demolition – Ottawa, Canada
It was a dull, dreary, overcast morning with lots of rain threatening from the south but, after 2 1/2 years of planning and preparation work, the planned implosion demolition of the 11 story Sir John Carling Building went ahead as scheduled and in only about 14 seconds the 11 story building became a contained pile of rubble. I was happy to have the opportunity to be there for the event and to assist Front Page Media Group in the documenting of this event. Unmanned GoPro cameras were stationed at various locations to capture the event from as many angles as possible.
The above high resolution video was taken with my Panasonic Lumix DMC-GH4 4K Mirrorless Micro Four Thirds Digital Camera from a prime location offering direct line of sight of the whole building. I left the camera filming after the explosions to capture not only the initial explosions that started the demolition process but also to capture the billowing cloud of dust that moved across the field toward our position a safe distance from the explosions. A pretty unique experience and the first of its kind in Ottawa, Canada. If you view this high resolution video at full screen size, you can see an employee scurrying to get to the safety of the cab of his truck before the billowing dust quickly closes in around him.